  • Power Division:-
    SBL Expertise in the Power Segment
    » Design, engineering & execution of HVACtransmission line projects in the class of 765 KV and 400KV
    » Design, engineering & execution of 400 KV and above AIS and GIS substations
    » Thermal power projects
    » Gas-based power plants
    » Balance of work of power plants
    Irrigation Division:-
    Investigation, design, engineering and
    construction of dams, spillways, reservoirs, canals including distribution systems.
    » Investigation, design and execution of minor and major lift irrigation projects.
    Hydrocarbons Division:-
    Laying of Well Fluid lines, Trunk lines (Oil & Gas), Gas Lift lines, Water Injection Lines
    Transportation Division:-
    The four-laning of Hyderabad–
    Karimnagar–Ramagundam Road from Km 28.200 to
    Km 235.058 was taken up on BOT-toll Basis.The total length of the project is 206 Km